| Customization: | Available |
|---|---|
| After-sales Service: | Technology Support |
| Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

Technical parameters
|
Type |
ZLT250/17 |
ZLT250/21 |
|
|
Power control |
Dual-inverter |
||
|
Input wire |
Φ2.6-Φ3.0mm |
Φ2.6-Φ3.0mm |
|
|
Output wire |
Φ0.40-Φ1.2mm |
Φ0.40-Φ1.2mm |
|
|
Maximum line speed |
1800m/min |
1800m/min |
|
|
Maximum number of dies |
17 |
21 |
|
|
Mechanical elongation |
25%+18.7% |
18.4%+15% |
|
|
Construction of the machine body |
Casting +steel plate welding and annealing |
||
|
Drawing capstan |
Tungsten carbide |
||
|
Final capstan |
Φ250mm |
||
|
Drawing/take-up motor |
AC55kW/AC11kW |
||
|
Take-up type |
SN500(SN630)Φ500×Φ300×345 |
||
|
Drive |
Gear drive |
||
|
Tension adjustment |
Buffer rod with air cylinder and rocker arm |
||
|
Correction system |
PIDAutomatic control of take-up by PID |
||
|
Maximum copper load |
200kg, 500kg |
||
|
Power supply |
380V, 50/60HZ |
||
|
Volume of lubricant |
100L/min |
||
|
Lubrication of wire drawing |
Lubrication by full immersion |
||
|
Brake |
Disk type brake |
||
|
Annealing capacity |
85KVA |
||
|
Annealing voltage |
Max-65V |
||
|
Annealing current |
1000A |
||
|
Steam consumption |
10-12m3/h, 0.2-0.30Mpa |
||
|
Cooling water consumption |
12-18m3/h, 0.2-0.25MPa |
||
|
Air consumption |
20-30m3/h, 0.4-0.6MPa |
||
|
DimensionsL×W×H |
9000×3000×3000mm |
||
|
Weight |
ca.7000kg |
||



| Company name | HOOHA Co.,Ltd |
| Established | 2003 |
| Main products | upcast and continuous casting machine,wire extrusion machine,wire stranding machine,wire drawing machine,test machine and so on. |
| Value added service | Include factory planning, cable raw material supply,cable equipment layout,cable technology export,customer training and cable testing laboratory construction. |
| Factory location | Humen Town,Dongguan City,Guangdong province. |
| Manufacturing Center | 4000 sqm |
| Showroom | More than 2000 sqm. |

| Question | Answer | |
| MOQ | 1 set | |
| Lead Time | 30~40 working days since starting producing. | |
| Warranty Time | 1-year quality guarantee for the machine | |
| Payment Terms | 30% T/T in advance for production material, 70% in the period of shipment. | |
| Installation (3 choices ) |
a. HOOHA's Chinese installation team. | |
| b. HOOHA's overseas installation co-partners in your country. | ||
| c. DIY Guide: HOOHA supports online guidance. | ||
| How to Start | Contact us and leave your contact email and phone number. |
| Team of HOOHA service | |||||
| Name | education | Position | Mainly responsible for project | Specializing in project | Industry working history (year ) |
| zanyang Xie | college | General Engineer | The total project design and planning | power cable machine | 15 |
| xioahua Hu | college | Vis general engineer | The total project design and planning | net cable,data cable machine | 10 |
| Chnaghong Cheng | college | Engineer | Drawings and after-sales service | Optical fiber cable machine | 25 |
| xiuwu Chen | college | General Engineer | The total project design and planning | copper drawing machine | 15 |
| lixin Yuan | college | Engineer | The project design and planning | coppwer wire making technical | 16 |
| zhenghai Qiu | college | cable engineer | After service | cable making and cable factory management servie | 15 |
| jinxin Liu | college | Marketing engineer | After service | electrical engineer | 7 |
| xingguo Tang | High school | Electrical engineer | After service | electrical engineer | 10 |
| changqiang Li | High school | Maintain engineer | After service | machina maintain and install service | 10 |
| haipin Li | University | Engineering director | Marketing and sales | project consulting | 8 |
| sen Yang | University | Engineering translator | Marketing and sales | project consulting | 5 |


