Customization: | Available |
---|---|
After-sales Service: | Installation and Training |
Driven Type: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Suitable for FEP (fluorinated Ethylene Propylene, also known as F46), FPA and ETFE (also known as F40) etc fluorine plastic production
Screw barrel:Adopt new No.3 steel GH113 (With the United States GDA material) corrosion resistant and High temperature resistant.
Crosshead: Adopt GH113 material special fixed centering crosshead or manual centering crosshead
Model |
30mm |
45mm |
65mm |
Screw L/D ratio |
25:1 |
25:1 |
25:1 |
Temperature control |
6 Segment |
6 Segment |
7 Segment |
Main motor power |
10HP |
15HP |
30HP |
Extrusion output |
20kg/hr |
45kg/hr |
100kg/hr |
Conductor diameter |
0.2-1.8mm |
0.4-6.0mm |
0.6-8.0mm |
Insulation back outer diameter |
0.4-2.0mm |
0.6-8.0mm |
1.0-10.0mm |
Electric control |
PLC SIEMENS |
Q1:What is your main brand for the electrical and mechanical parts?
A:China famous brand and taiwan brand
Q2:Could we appoint the parts brand?
A: Yes,SIEMENS, Danfoss,Yaskawa, or theirs that you like
Q3:Could you please arrange the installation and commissioning?
A: Yes,we could and the buyer pay the charge
Q4:Could you arrange the production education?
A:Yes,we could and the buyer pay the charge
Q5:Could you do the design for the whole plant
A: Yes , we can.
Q6:What is the difference with other supplier?
A:What we could offer to other customer is not only the machine itself, also we could offer: factory design, production process design , QC control and education and assist machine and raw material offering .
Q7:What's the payment terms?
A:T/T,30% deposit and 70% balance before delivery.
Q8:How long the guarantee ?
A: one year and charge for repair the whole life.
Q9: Do you have any video for the machine running to get more details ?
A: Yes , we have . our yoube channel is : tiezhong chi OR HOOHA CO.,LTD
5.We focuses on wire and cable making solution:
1)The overall operation suggestions of the cable factory
2)Installation and debugging of overall machinery and accessories of the cable factory
3)Cost accounting service of overall mechanical equipment and components
4)Cost accounting service of raw materials and accessories
5)Cost accounting service of overall operation.
6)Talent delivery and training service.
7)Overseas on-site guidance and consulting services for equipment installation.
8)Maintenance,reconstruction and upgrade services of the overall equipment.