Customization: | Available |
---|---|
After-sales Service: | Technical Support |
Driven Type: | Electric |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is fit for proportion of wire such as power line insulating coat electrical cable.
Machine model
|
HH-90
|
HH-100
|
HH-120
|
HH-150
|
|
Pay-off line type
|
Double axes way /max axes way
|
max axes way
|
|||
Pay-off bobbin size(mm)
|
630-800/1250
|
630-800/1600
|
1600-2000
|
2500-3150
|
|
Screw diameter(mm)
|
Φ90
|
Φ100
|
Φ120
|
Φ150
|
|
L/D of screw
|
25:1BM type
|
25:1BM type
|
25:1 type
|
25:1 type
|
|
Extrusion capacity(kg/hr)
|
280
|
350
|
400
|
600
|
|
Main unit power
|
50HP
|
70HP
|
100HP
|
150HP
|
|
Wire spec.(mm)
|
Φ3-25
|
Φ5-40
|
Φ50-80
|
Φ60-120
|
|
Cooling device
|
Single layer U type
|
||||
Capstan power
|
7.5HP
|
10HP
|
15HP
|
20HP
|
|
Wire speed(m/m)
|
MAX200
|
MAX200
|
MAX150
|
MAX100
|
|
Take-up line type
|
Double axes way /max axes way
|
max axes way
|
Team of HOOHA service | |||||
Name | education | Position | Mainly responsible for project | Specializing in project | Industry working history ( year ) |
zanyang Xie | college | General Engineer | The total project design and planning | power cable machine | 15 |
xioahua Hu | college | Vis general engineer | The total project design and planning | net cable,data cable machine | 10 |
Chnaghong Cheng | college | Engineer | Drawings and after-sales service | Optical fiber cable machine | 25 |
xiuwu Chen | college | General Engineer | The total project design and planning | copper drawing machine | 15 |
lixin Yuan | college | Engineer | The project design and planning | coppwer wire making technical | 16 |
zhenghai Qiu | college | cable engineer | After service | cable making and cable factory management servie | 15 |
jinxin Liu | college | Marketing engineer | After service | electrical engineer | 7 |
xingguo Tang | High school | Electrical engineer | After service | electrical engineer | 10 |
changqiang Li | High school | Maintain engineer | After service | machina maintain and install service | 10 |
haipin Li | University | Engineering director | Marketing and sales | project consulting | 8 |
sen Yang | University | Engineering translator | Marketing and sales | project consulting | 5 |
Machine model | HH-30+70+40 | HH-20+35+20 | HH-30+80+40 |
Applied material | Apply to FE-PE,PE material,after change screw rod can apply | ||
Conduct diameter(mm) | Φ0.5-2.27 | Φ0.2-0.8 | Φ2.5-3.0 |
Finished wire diameter(mm) | Φ3-14 | Φ3.0-1.5 | Φ12-30 |
Foam degree | Max:82%(high-pressure) | ||
Power | 380V,3Phase 4line,45KW | 380V,3Phase 4line,25KW | 380V,3Phase 4line,55KW |