Here is our new designed extrusion line.
There are 2 sperate lines share the same space and same water tank.As you can see every part are double.
To a great extent, this speacial design can help you save a half of space and labor.
If your factory space is limited for 2 extrusion lines, welcome to contact me for more details
CONSISTING COMPONENTS |
1. Double shaft type Pay off stand |
|
2. Dancer |
3. Main extruder |
4. Automated loader & dryer |
5. Crosshead |
6. Double layer Moving trough |
7. Main cooling trough |
8. Water wiper |
9. Digital Diameter controller |
10. Mark printer |
11. Accumulator |
12. Capstan |
13. 15KV Spark tester |
14. Meter counter |
15. Dual shaft type Take up |
16. Master control Control box |
extrusion machine |
NO. |
Model |
50+35MM |
60+35MM |
70+35MM |
80+40MM |
90+50MM |
1 |
Pay off type |
initiatire type |
initiatire type |
No-axis magnetic |
No-axis magnetic |
No-axis magnetic |
2 |
Screw L/D |
|
|
|
|
3 |
Out put |
110KG |
170KG |
210KG |
270KG |
390KG |
4 |
Main motor |
15HP |
30HP |
30HP |
40HP |
50HP |
5 |
Wire diameter |
1-4MM |
1.5-8MM |
2-10MM |
3-20MM |
4-45MM |
6 |
Temperature control |
7 zones |
8 zones |
8 zones |
9 zones |
9 zones |
7 |
Cooling device |
Folds W type/U type |
Folds W type/U type |
Single layer/double |
Single layer/double |
Single layer/double |
8 |
Capstan motor |
3HP |
4HP |
5HP |
7.5HP |
7.5HP |
9 |
Take up |
Double axis |
Double axis |
No-axis magnetic |
No-axis double |
No-axis doublec |

After-sales Service
1).Delivery dates: 45 days
2).Payment: TT or L/C
3).Packing: plastic packing ensure the goods' safety during the transportation.
4).Electrical engineers(10), mechanical engineers(8), software engineers(5). They all have over 10-year experience
Professional Engineers and Experienced Sales Team
Team of HOOHA service |
Name |
Education |
Position |
Mainly responsible for project |
Specializing in project |
Industry working history ( year ) |
Zanyang Xie |
college |
General Engineer |
The total project design and planning |
power cable machine |
15 |
Xiaohua Hu |
college |
Vis general engineer |
The total project design and planning |
net cable,data cable machine |
10 |
Changhong Cheng |
college |
Engineer |
Drawings and after-sales service |
Teflon,Optical fiber cable machine |
25 |
Xiuwu Chen |
college |
General Engineer |
The total project design and planning |
copper drawing machine |
15 |
Lixin Yuan |
college |
Engineer |
The project design and planning |
coppwer wire making technical |
16 |
Zhenghai Qiu |
college |
cable engineer |
After service |
cable making and cable factory management servie |
15 |
Jinxin Liu |
college |
Marketing engineer |
After service |
electrical engineer |
7 |
Xingguo Tang |
High school |
Electrical engineer |
After service |
electrical engineer |
10 |
Changqiang Li |
High school |
Maintain engineer |
After service |
machina maintain and install service |
10 |
Haipin Li |
University |
Engineering director |
Marketing and sales |
project consulting |
8 |
Sen Yang |
University |
Engineering translator |
Marketing and sales |
project consulting |
5 |