Customization: | Available |
---|---|
After-sales Service: | Online/on Spot |
Warranty: | 12 Month |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Coiling Speed | 800 RPM |
Coiling Size | Outside diameter is 200-460mm, height is 50-120mm, Inner diameter is 140-220mm |
Applicable Wire Range | 1-12mm |
Power Supply | AC 380 V, three-phase, 50 HZ or customized |
Operation Direction | Left or right side(Can be customized) |
Packaged Coil Weight | MAX 35 kg |
1 | Automatic packaging, wrapping and labeling |
2 | Packing label capacity 7 times more than manual |
3 | 200m per coil and coiling speed 4 times more than manual |
4 | Can be directly connected to the extrusion machine |
5 | Servo motor flat cable system, perfect packing |
6 | Automatic warning system, easy control of the operation |
7 | 99 types of the coiling storage and can change as you like |
8 | Touch screen man-machine interface operation, all circuit control adopt microcomputer programmable controller |
9 | Cable row system adopt servo motor wiring system, the speed as the same as the main machine |
10 | The meter count is close to the accuracy of 0.01,forecast slow down the speed, automatic coiling renew. One coil can be set and close to 0.2% accuracy |
11 | The machine PLC contacts with power frequency spark machine for the spark of BV line detection, can automatic spark breakdown point or artificial mark continue knitting function or automatic increase 5 meters length into a circle |
12 | The machine PLC contacts with caliper gauge. Diameter is not up to standard can be automatically eliminate waste line or artificial marking after continue to function |
1.Pre-sales training: in order to ensure the correct operation of the machine, we can provide customers with professional operation training if needed, including
1) correct operation method
2) correct maintenance method
3) solve simple problems of our products
2.During the period of service:Each machine is to be inspected internally and by the buyer himself before shipment. As for machine production, we have our strict product checkout process. We will mark the name of each device. Those devices must be signed to guarantee quality before being sent to our customer's factory,which ensuring the good condition of our products.
3.After-sales service:Since the date of shipment, our company's free after-sales service during the warranty period is as follows
1)1 year for mechanical part
2)12-15 months for electrical part
3)Offer lifetime consultation on problems occurred
Become a team of experts in the wire and cable industry, we are able to bring more benefit to our customers, and offer the most suitable solutions for them. We are always seeking to help our customers save costs and time and help them reduce worries.
We have been exporting at the front end of the supply chain of wire and cable manufacturing machines, wire and cable tester equipment for almost 20 years. We have worked with more than 100 customers and spent more than five years supporting them to make their business run smoothly, and they use our products to achieve their business goals.
We not only provide customers with the most cost-effective products, but also provide a series of services, including after-sales technical support and operation guidance, and provide solutions to problems happened in the follow production process. We always stand on the side of customers to meet the real needs of them, which is what we have been insisting on.
Located in Humen Town,Dongguan City,Guangdong province,China.
Add: 3 rd Floor, Building D, No.38 Houhu Road, Humen Town, Dongguan City, Guangdong Province,China
Hongkong airport to Humen by boat 2 hours
Guangzhou airport to Humen by car 2 hours
Shenzhen airport to Humen by car 1 hour
Guangzhou South high speed train station to Humen 20 minutes
Shenzhen North high speed train station to Humen 20 minutes